Residential · Kitchens
A full kitchen remodel with OMNI covers demolition, cabinetry, countertops, backsplash, lighting, flooring, and the plumbing and electrical behind them — planned, permitted, and built by one team.

The short answer
A kitchen remodel in Conroe TX typically includes tear-out, any layout or structural changes, new cabinetry, countertops, sink and faucet, backsplash, lighting and electrical updates, flooring, paint, and appliance installation. Pricing depends mostly on cabinet construction, counter material, and whether walls or plumbing move. We put allowances in writing so the budget is visible from day one.
Complete jobs

Materials & design
Timeline
Walkthrough, budget conversation, and scope confirmation — about 1 week.
Layout, cabinet drawings, and finish selections locked — 2 to 4 weeks.
Permits submitted and cabinets ordered — 2 to 6 weeks of lead time.
Demo, rough-in, cabinets, counter template and install, tile, paint — 6 to 9 weeks.
Punch list, appliance start-up, and warranty handoff — a few days.
Local relevance
Homes built here through the 1970s and 80s tend to share the same handful of issues: a closed galley or U-shape walled off from the living room, a peninsula that chokes the doorway, soffits hiding ductwork above the uppers, and undersized electrical with no dedicated circuits for a modern range or microwave. Slab foundations mean drain relocations need saw-cutting, so we confirm plumbing routes before you fall in love with a new island position. Slab movement also shows up as out-of-level cabinet runs — we scribe and shim rather than pretend the floor is flat.
Questions
Most full kitchens run 8–12 weeks on site once materials are on hand. Layout changes that move plumbing or take out a load-bearing wall add time for engineering and inspection. Selections made late are the single biggest cause of delay, so we lock cabinets, counters, and appliances before demolition.
A cosmetic replacement usually does not, but moving plumbing, adding circuits, relocating gas, or altering structure does. OMNI pulls the permits and schedules inspections as part of the contract — you should not be standing in line at the city.
Most families do. We set up dust containment at the kitchen opening, protect flooring on the path in and out, and can rough in a temporary sink and fridge space so you keep a working setup.
Cost tracks with cabinet construction, counter material, and whether the layout moves. We give a written scope with allowances so you can see exactly where dollars go.
Send us your layout, your must-haves, and a budget range. We'll walk the space and put a written scope in front of you.